6 Storey Ramp-up Warehouse at Tanjong Kling Road (SH Design)

Project Status: Completed
Project Type: Commercial
Share this project:
Through the use of prefabricated cages in this project, our customer was able to improve their site productivity by 54 times.
Location
1 Buroh Crescent, 6M Cogent 1 Logistics Hub, Singapore 627545

Conventional tying of links and main bars would have taken 6 workers approximately 9 hours to install each of the post-tensioned beams required for this project.

采用传统的绑扎方法,6 名工人绑扎一根 12 米长的后张梁需要 9 个小时。
采用传统的绑扎方法,6 名工人绑扎一根 12 米长的后张梁需要 9 个小时。
采用传统的绑扎方法,6 名工人绑扎一根 12 米长的后张梁需要 9 个小时。
采用传统的绑扎方法,6 名工人绑扎一根 12 米长的后张梁需要 9 个小时。

Technical specifications: Post-tensioned beams of 2.2m (W) x 1.05m (H) x 12m (L); 2.5MT each

Productivity ratio using non-prefabricated methods: 21.6 manhour/MT

Productivity ratio using BRC’s prefabrication solutions: 0.4 manhour/MT

54x
Productivity Improvement
In contrast, the same beam, when prefabricated as a cage, took 4 workers just 15 minutes to install.
相比之下,同样的横梁,在预制成钢筋笼后,4 个工人只用了 15 分钟即可安装完毕。
相比之下,同样的横梁,在预制成钢筋笼后,4 个工人只用了 15 分钟即可安装完毕。

By using prefabricated beams, the same task took 4 workers only 15 minutes to install.

Find out how your business can benefit from our tailored reinforcement solutions today.